Bengaluru, 13 November — Prime Minister Narendra Modi laid the foundation stone for a compressed biogas plant at Haralakunte in south Bengaluru. GAIL has proposed an investment of ₹123.42 crore for the facility, which is designed to process 300 tonnes of segregated organic municipal waste a day at the Karnataka Compost Development Corporation site.
One waste stream, two products
At its planned daily intake, the plant is expected to produce 12.6 tonnes of compressed biogas and 21.6 tonnes of fermented organic manure, according to GAIL’s 11 November project briefing. GAIL Gas will receive the fuel. The design also includes odour control and treatment of wastewater from the plant.
Who supplies the land and the waste
The foundation laying follows a three-party concession agreement announced in October 2025. The Greater Bengaluru Authority is to provide 18 acres at Haralakunte. Bengaluru Solid Waste Management Limited is responsible for supplying the segregated waste, and GAIL will develop the plant. The 25-year concession runs from the date of commissioning.
For Bengaluru’s waste system, the critical link is the daily collection of a separated organic stream. The supply agreement gives that material a destination, while the arrangement with GAIL Gas identifies where the fuel will go. Once the plant is operating, the volume of segregated waste it actually receives will help determine how much material the city can divert from landfill.
Primary sources · Prime Minister’s Office event report, 13 November 2026 · GAIL project specifications, 11 November 2026 · GAIL concession announcement, 17 October 2025

